The EU Landfill Directive applies a number of restrictions that member states must apply to the management of waste.

The EU Landfill Directive applies a number of restrictions that member states must apply to the management of waste.

These have been transposed in the UK through the Landfill Regulations and include:

  • The targets for the diversion of municipal bio-degradable waste from landfill
  • The banning of certain wastes – such as tyres – from landfill
  • A ban on the mixing of hazardous and non-hazardous wastes at landfill
  • And the treatment of all waste prior to landfill

Most of these requirements have been introduced in a staged manner over the period from 2002 to 2005. As from 30 October 2007, two of the final requirements of these regulations came into force:

  • The banning of non-hazardous liquids to landfill
  • All non-hazardous waste has to be treated before being disposed of to landfill
The purpose of the treatment requirement is to reduce the impact of waste of waste that has to be landfilled and to increase the amount of waste that is recycled.

The responsibility for ensuring that their waste is pre-treated rests with the waste producer in a similar way to the Duty of Care requirements which require the producer to ensure their waste is collected and disposed of correctly. However, the point at which the treatment test is applied is when the waste arrives at a landfill site and the site will require a declaration from the haulier that the waste has been pre-treated.

Where the waste is delivered in by a compaction vehicle that will have collected the waste from several sites, the Agency will expect there to be an audit trail to show that each site from which the waste on that load has been collected has satisfactory treatment in place on the site ie that there is some recycling taking place at the site.

The Directive states that ‘Treatment’ will be deemed to have been carried out when waste has been through a three point test: Treatment must: Be a physical, thermal, chemical or biological process - which can include sorting Change the characteristics of the waste And do so in order to:

  • Reduce its volume; or
  • Reduce its hazardous nature; or
  • Facilitate its handling; or
  • Enhance recovery
All three points must be satisfied, but for England, Wales and Northern Ireland, 'volume' has been interpreted as 'weight' by the relevant enforcement agencies. Scotland, however, have decided to accept compaction as a form of valid treatment.

The requirement applies to each site and each separate waste stream on that site. Therefore, a shop or small industrial unit that generally mixes all its waste as a single stream would have the requirements applied to that single stream, regardless of how many containers were on site. However, a factory that had an office and canteen in one part of the site that had it’s own waste containers and a production line in another part that had different types of waste would need to apply the treatment criteria to both streams.

Generally, we would consider a stream as defined by the European Waste Catalogue (EWC) code that would have to be provided on the transfer note. Therefore, a number of containers categorised as General Waste – 20 03 01 – would be one waste stream whilst a compactor with, say, 02 06 01 waste from food preparation would be another stream. In that case, each stream would need to satisfy the treatment requirements.

For most general commercial and industrial waste, this means that part of that waste stream would need to be recycled.

This can be done in one of two ways:

  • Either some waste that would otherwise be mixed with that stream can be separately collected for recycling; or
  • The waste can be collected mixed, but would then have to go to a sorting facility for a proportion of it to be remove.

In the former case, this would generally mean having a separate container on site for at least one recyclable material eg cardboard, office paper, glass etc. There is no clear guidance from the Agency on the proportion of the waste that would need to be removed, only that it should be significant and consistent. Therefore, removing one cardboard box a year would not be considered suitable. But having a cardboard bundle removed once a fortnight would. Some examples are shown below.

Where the waste produced by the site is unsuitable for recycling or where there is not the space to separate out part of the stream or where the site does not have the ability or wish to separate, then the waste can still be collected mixed, but it would need to be taken to a sorting facility where a proportion of the waste would need to be removed for recycling prior to the waste being bulked up and shipped to landfill.

Where waste is not disposed of to landfill eg incineration, the treatment requirements do not apply.

What does this mean for Biffa customers?

In order make compliance with this requirement as simple as possible, Biffa has launched a new dry mixed recycling (DMR) collection service for our customers.

In addition, we can also provide pre-treatment of untreated wastes. You can contact Biffa to discuss your requirements by phoning 0800 307 307.

Examples:

Example 1 - An office has a paper recycling scheme in place. The residual waste that is collected for disposal to landfill is considered to be pre-treated as its weight has been reduced from what it would have been if there was no office paper recycling scheme in place.

Example 2 - A pub has a separate container into which it places its empty bottles. The general waste is then considered to have been pre-treated.

Example 3 – A small industrial unit has a front end loader container for its waste. Its waste cardboard is kept separate and collected in bundles for recycling. The general waste is considered to have satisfied the pre-treatment requirements.

Example 4 – An office has the toner cartridges from its printers collected for recycling. The residual general waste is considered to have satisfied the pre-treatment requirements.

Example 5 - A site places all of its waste into a container which is then emptied by a compaction vehicle. The waste is NOT considered to be pre-treated and will then have to be treated at a separate facility before delivery for disposal to landfill.

Example 6 – A large factory site with an office block has office paper recycling. However, there is no separation of any waste from the production line for separate treatment. The residual office waste would be considered to have satisfied the pre-treatment requirements but the production line waste would not and would have to be collected and treated in a separate facility for disposal to landfill.